The Milwaukee Streetcar training class and support staff took Vehicle #03 for a 2.1 mile run from the Intermodal Terminal to Burns Commons on August 22, making it the first daylight end-to-end route test.
The 83,000 pound vehicle was expected to test between 31 and 42 miles along the route, with higher through less traffic-dense straightaways, like East Ogden Avenue. Including the weight of the training crew, stacks of bottled water bundles created 20,000 pounds of ballast to simulate a capacity ride load. The streetcar fleet must log more than 620 miles of testing before it can begin passenger service, which is expected to be completed in time for a November launch. These images document the streetcar’s testing at the Burns Commons Station.
- Milwaukee Streetcar makes special appearance at Cathedral Square for Bastille Days
- The Hop marks major milestone for end of Streetcar construction with ceremonial last weld
- Safety tips released for motorists and pedestrians on sharing road with The Hop Streetcars
- The Hop to hold job fair for Streetcar positions
- Milwaukee’s first streetcar for The Hop completes successful maiden track test
- After half century Milwaukee is again home to a Streetcar
- Streetcar manufacturer delivering first vehicle to Milwaukee
- Streetcar route alters festival footprint for 2018 Bastille Days
- Milwaukee Streetcar reaches deal with Transit Workers Union
- City seeks proposals for marketing Milwaukee Streetcar
- The Hop: Potawatomi’s $10M Streetcar sponsorship includes free rides
- Mayor Barrett walks with Streetcar workers along Milwaukee’s transit future
- Photo Essay: Digging up Milwaukee’s Streetcar Past
- Video: 1922 Streetcar Rails from Route 10
- Milwaukee Notebook: Streetcar builds on a sometimes strange history
- Streetcar construction on target to meet minority employment and contracts
- Another 320 feet of track cemented along Streetcar route
- Photo Essay: Streetcar work moves through downtown
- Crews reshape roadway as first streetcar rails installed
- Milwaukee public gets first look at streetcar rail construction
- Photo Essay: Streetcar leaves footprint as rail welding begins
- Construction of rail lines to begin for Milwaukee Streetcar
- Streetcar extension to connect Bronzeville and Walker’s Point in future
- Virtual rail system could bridge Milwaukee’s transit network
Lee Matz